I FEEL THAT A SLIGHT EXPLANATION IS REQUIRED BEFORE VIEWING THE GYM PICTURES IN ORDER TO AVOID CONFUSION AND MIS-UNDERSTANDINGS.
WE ARE CONTINUIOUSLY IN A STATE OF CHANGE WITH THE BUILDING. SOME OF THE PICTURES ON THIS SITE MAY NOT REPRESENT THE CURRENT STATE OF THE GYM. ALSO, PLEASE EXCUSE THE TEMPORARY STATE OF DIS-ARRAY IN SOME AREAS. WE HAVE ALOT OF CHANGES THAT WE INTEND TO MAKE TO THE BUILDING IN ORDER TO TRY AND HAVE THE BEST POSSIBLE TRAINING FACILITY THAT WE CAN. THIS IS A VERY LARGE OLD BUILDING (9000 SQ FT) WITH A LOT OF POTENTIAL. THANK YOU IN ADVANCE FOR YOUR PATIENCE AND UNDERSTANDING.
WE ARE CONTINUIOUSLY IN A STATE OF CHANGE WITH THE BUILDING. SOME OF THE PICTURES ON THIS SITE MAY NOT REPRESENT THE CURRENT STATE OF THE GYM. ALSO, PLEASE EXCUSE THE TEMPORARY STATE OF DIS-ARRAY IN SOME AREAS. WE HAVE ALOT OF CHANGES THAT WE INTEND TO MAKE TO THE BUILDING IN ORDER TO TRY AND HAVE THE BEST POSSIBLE TRAINING FACILITY THAT WE CAN. THIS IS A VERY LARGE OLD BUILDING (9000 SQ FT) WITH A LOT OF POTENTIAL. THANK YOU IN ADVANCE FOR YOUR PATIENCE AND UNDERSTANDING.
DOWN STAIRS FRONT ROOMS & HALLWAY
UPSTAIRS
THESE ARE IN PROCESS PICTURES OF THE CURRENT UPSTAIRS RENOVATION AND RE-DESIGN OF THE SPACE LAYOUT.
BACK ROOM (old)
WE TOTALLY GUTTED THE BACK ROOM IN ORDER TO MAKE MUCH DESIRED IMPROVEMENTS FOR THE FUTURE. EVERYTHING EXCEPT THE STOVE AND OIL TANK WAS REMOVED AND THE SPACE WAS STEAM PRESSURE WASHED FLOOR TO CEILING TO HELP REMOVE THE ANCIENT PAINT, AND SANITIZE THE AREA. THE MATS HAVE BEEN RE-ORGANIZED IN AN ARRANGEMENT THAT ALLOWS BOTH FOR BETTER FITMENT, AND A CLEANER LOOK.
WE ARE CURRENTLY IN THE PROCESS OF STUDING OUT AND INSULATING THE ENTIRE AREA BEHIND THE WALL PADS. THIS IS PRODUCING A MUCH STRONGER CONTACT SURFACE WITH NO WORRIES ABOUT HEADS BEING DRIVEN INTO THE WALLS WHILE GRAPPLING. THE WALL PADS ARE NOW ALONG THE FLOOR LEVEL.
WE ARE CURRENTLY IN THE PROCESS OF STUDING OUT AND INSULATING THE ENTIRE AREA BEHIND THE WALL PADS. THIS IS PRODUCING A MUCH STRONGER CONTACT SURFACE WITH NO WORRIES ABOUT HEADS BEING DRIVEN INTO THE WALLS WHILE GRAPPLING. THE WALL PADS ARE NOW ALONG THE FLOOR LEVEL.
REAR MAT ROOM (AS OF 8/2/11)
THE REAR MAT ROOM NO LONGER LOOKS LIKE THIS. WE HAVE THE REMOVED ALL OF THE MATS TO MAKE ROOM FOR OUR 22' COMPETITION CAGE. MOST OF THE MATS ARE CURRENTLY UPSTAIRS IN THE BAG ROOM TO ALLOW US TO CONTINUE PRACTICE UNTIL WE GET THE CAGE SITUATED CORRECTLY. UNFORTUNATELY, WE ARE EXPERIENCING DIFFICULTIES WITH THE CAGE ASSEMBLY DUE TO THE MANUFACTURER'S FABRICATION ERRORS. HOPEFULLY THIS WILL BE STRAIGHTENED OUT SOON SO THAT WE CAN GET BACK TO OUR BUILDING IMPROVEMENTS.